Philippines Alien Employment Permit (AEP) and 9(g) Visa for Chinese Employees: 2027 Guide for EOR Hires

Chinese nationals who work in the Philippines for more than a few months usually need two approvals in sequence: an Alien Employment Permit from the labor department and a 9(g) pre-arranged employee visa from immigration. This guide explains both steps, the 2026 rule changes that are officially confirmed versus only reported, and the conditions to check before using a local legal employer.

EOR
Table of Contents

Written By Gloria Sun, Global HR and Payroll Expert · Published November 16, 2026 · Updated November 17, 2026 · Estimated read: 28 min

A Chinese national who will work in the Philippines for more than six months generally needs an Alien Employment Permit (AEP) from the Department of Labor and Employment (DOLE), and then a 9(g) pre-arranged employee visa from the Bureau of Immigration (BI), issued through the Philippine consulate in China. The employer in the Philippines files both. DOLE rules changed repeatedly in 2025 and 2026: AEP processing moved to one central bureau, and a further order announced in late October 2026 reportedly shortens processing and removes newspaper publication. Fees and validity under the current order should be confirmed with DOLE before budgeting.

Table of Contents

  1. The Short Answer: Two Agencies, Two Steps
  2. Who Needs an AEP, and When a Different Permit Applies
  3. The 2025 to 2026 Rule Changes: What Is Official and What Is Reported
  4. The Labor Market Test, Economic Needs Test and Understudy Plan
  5. Documents and the Notarized Employment Contract
  6. Exclusions and Exemptions: Intra-Corporate Transferees and Others
  7. The 9(g) Pre-Arranged Employee Visa Through the Guangzhou Consulate General
  8. AEP vs Special Work Permit vs Provisional Work Permit
  9. Can an EOR Be the Philippine Employer? Conditions to Check
  10. How Knit People Supports EOR and Work Visa Hires in the Philippines
  11. Illustrative Scenario: A Chinese Engineer Hired Through the Local Legal Employer
  12. 2027 Planning Checklist and Risk Register
  13. Frequently Asked Questions
  14. Glossary of Key Terms
  15. About Knit
  16. Related Reading

1. The Short Answer: Two Agencies, Two Steps

If your company is building a team in Manila, Cebu or an economic zone and some of the people will be Chinese nationals, you will deal with two government bodies, and they do not share one application.

The first is DOLE, which issues the Alien Employment Permit, usually shortened to AEP. The legal anchor is Article 40 of the Labor Code of the Philippines, which requires a foreign national and the Philippine employer to obtain a permit before work begins. DOLE's own FAQ describes the AEP as the permit foreign nationals need to work for a Philippine employer for more than six months (see the Bureau of Local Employment AEP FAQ, December 2021).

The second is the Bureau of Immigration (BI), which handles the 9(g) pre-arranged employee visa. The Philippine consulate general in Guangzhou explains that the Philippine employer files a petition with BI, and the consulate issues the visa only after prior authorization from the Department of Foreign Affairs (DFA) in Manila (see the Guangzhou consulate 9(g) page).

The order matters. DOLE's regional office in the Cordillera region states that BI will not issue the 9(g) working visa until the DOLE AEP is obtained (see the DOLE Cordillera work permit page). In practice the AEP is the gate, and the 9(g) visa follows.

Three points set the frame for the rest of this guide:

  • The Philippine employer is the applicant. Both steps assume a Philippine-registered employer that has a real employment relationship with the worker. This is where an Employer of Record (EOR) enters the picture, and Section 9 covers the conditions.
  • Chinese nationals are foreign nationals in the Philippines. There is no special channel for Chinese passport holders in the official pages we reviewed. We found no official confirmation of any visa-free work arrangement, so none is assumed here.
  • The rules moved quickly in 2026. Some changes are confirmed on official pages. Others are visible only in law firm and news summaries because the official order text was not reachable for our review. This guide marks each statement accordingly.

This article covers work authorization only. It does not cover residence, long-term stay or any immigration status beyond the permission to work for a specific employer.

2. Who Needs an AEP, and When a Different Permit Applies

The base rule is simple: a foreign national who works for a Philippine employer for more than six months needs an AEP. For work under six months, DOLE's 2021 FAQ points to alternatives: a Special Work Permit (SWP) from BI, or an AEP, or a DOLE certificate of exclusion or exemption where the person qualifies. Section 8 compares these.

Some points that surprise first-time employers:

The AEP is tied to the job and the employer. DOLE Cordillera's explainer on the difference between an AEP and an SWP notes that an AEP is tied to a specific position and employer, and that a job change requires a new AEP (see the DOLE Cordillera AEP vs SWP explainer). A January 2026 regional report adds that foreign workers must work only in the location and position stated in the AEP, and that deployments to other regions or projects draw closer scrutiny (see the Philippine Information Agency report, January 2026).

Holding another visa type does not remove the requirement. DOLE Cordillera states that holders of several special visa categories still need an AEP unless an exemption applies. If an employee is already in the Philippines on another status, ask counsel whether the AEP and a visa conversion can be done in the country, which is the "Option 1" route in DOLE's 2021 FAQ, or whether the employee must apply from abroad, which is "Option 2."

Contract timing is a compliance point. The January 2026 regional report says a foreign national's employment contract takes effect only after DOLE issues the AEP. If your offer letter or contract has a start date, build in language that makes the start conditional on permit issuance, and do not let the person begin productive work early.

Enforcement is real. In June 2024, DOLE told the Philippine News Agency that frontline staff, particularly in the National Capital Region, were adding inspections to document review, and that DOLE shares data with BI (see the Philippine News Agency report, June 2024). That article was driven by raids on offshore gaming operations, but the direction of travel, closer checking of who actually works where, applies to all sectors.

For a Chinese company, the practical question is usually: "Is this person a new local hire, an existing group employee being assigned to a Philippine affiliate, or a short-term visitor?" Each answer leads to a different permit path. The rest of this guide follows those branches.

3. The 2025 to 2026 Rule Changes: What Is Official and What Is Reported

AEP rules were rewritten more than once between 2025 and November 2026. This section lays out what we could confirm and where the evidence is thinner. Treat the table as a map for questions to ask DOLE, not as the text of the orders.

Important caution about sources. Official DOLE and Philippine Information Agency pages for the newest orders could not be opened for our review, so we could not read the order texts for DO 248, 248-B or 248-C. The items below marked "reported" come from advisory firm and news summaries. The controlling source is always the order as published by DOLE and the guidance issued by the Bureau of Local Employment (BLE).

Item What we found Status
DO 248, series of 2025 Described by a DOLE regional office in January 2026 as the governing rule with stricter hiring guidelines. It refers to a Labor Market Test, an Economic Needs Test and an understudy or skills development program. Confirmed on a government page (Philippine Information Agency, Jan 2026); order text not reviewed
DO 248-B, series of 2026 Reported as published on 11 June 2026. It moves all AEP functions to the BLE and replaces references to regional offices with the BLE. Regional offices must hand over inventories and records. Reported by an advisory firm alert (June 2026); order text not reviewed
Online filing from 3 September 2026 One secondary article reports that new permits, renewals, exemption and exclusion requests must be filed through DOLE's online portal from that date. Single secondary source; confirm with BLE
DO 248-C, series of 2026 Reported as issued on 27 October 2026, amending 248-B to simplify the AEP process. Processing reported at 10 working days, with one extension of up to 10 more. Newspaper publication of the labor market notice reportedly discontinued. Reported by advisers and the press (advisory firm alert, law firm alert, November 2026); order text not reviewed

A source conflict on the effective date. One adviser alert says DO 248-C takes effect on 11 November 2026. A Philippine newspaper report from 28 October 2026 says it takes effect 15 days after publication in newspapers of general circulation, and does not give the publication date. We could not settle this. If you have an application in preparation, ask the BLE which rules apply to your filing date, and ask in writing.

A second conflict on processing time. The 2021 DOLE FAQ says processing takes five working days after the labor market test. The advisory summaries of the 2026 order describe a change from 15 to 10 working days. The 2021 figure belongs to an earlier regime and should not be used for planning. Use the current BLE guidance, and plan with the longer reported ceiling of 20 working days if an extension is used.

What the 2026 changes mean in plain terms:

  • One desk, not many. If your team previously worked with a regional office near the workplace, the central BLE is now the counterpart. Local relationships help less, and document discipline helps more.
  • Fewer pre-filings. Reported changes remove the need to attach certain other-agency documents to the AEP file, such as a construction license, a Professional Regulation Commission temporary permit, a Department of Justice authority to employ an alien, or a Department of Environment and Natural Resources authority to hire a foreign national. The same reports stress that compliance with those agencies' own laws remains mandatory. Removing a document from the AEP checklist does not remove the underlying rule.
  • No in-house barrier. Reports say agent and representative accreditation was discontinued, so an employer can file with its own HR staff. Foreign applicants may also be asked to complete an orientation on Philippine history and cultural diversity. Both points are reported only and should be confirmed.
  • Fees timing. Reports say payment is not collected on submission and that the order of payment is issued after technical evaluation and approval. The government fee amounts under the current order were not confirmed in our review, so this article gives no fee figures.

For 2027 planning, the safest assumption is that DOLE will keep issuing implementing guidance after these orders. Build a re-check step into every filing calendar.

4. The Labor Market Test, Economic Needs Test and Understudy Plan

The Philippine system protects local job seekers. The AEP is not a formality, and this is the part of the process most likely to surprise a company that has simply "hired the best person."

The Labor Market Test (LMT). Under the 2021 FAQ, the employer published the vacancy in a newspaper of general circulation at least 15 days before filing, with a newspaper clipping and a notarized affidavit that no qualified Filipino was available or considered. DOLE's regional office in January 2026 still described the test as newspaper publication. As noted in Section 3, the reported DO 248-C change replaces newspaper advertising with notices on DOLE's portal or public repository, or filing with the National Administrative Register at the University of the Philippines Law Center. One alert says DOLE has not yet clarified the submission process. Until the BLE publishes procedures, ask exactly how your notice is to be posted and how long it must run.

The Economic Needs Test (ENT). The January 2026 regional report describes an assessment of whether the foreign hire is necessary and beneficial to the economy. The reporting does not set out the criteria in detail, and we did not review the order. Prepare a short, factual business case: what the role does, why the skills are specific, and how the role supports local operations or investment.

The understudy or skills development program. The same report says the foreign worker must train a Filipino counterpart. For a Chinese company, this is more than a form. If the role is, for example, a manufacturing process lead or an IT architect, plan the knowledge transfer: who the local counterpart is, what the training plan covers, and how progress will be recorded. Whether your case needs a formal program, and in what form, is a point to confirm with the BLE or local counsel.

The approval standard. A DOLE Cordillera official was quoted in that January 2026 report saying that where a competent Filipino can do the job, the AEP will not be approved. DOLE Cordillera's page also lists denial grounds: misrepresentation of facts, falsified documents, derogatory records, and the availability of a competent and willing Filipino worker.

Why this matters for an EOR hire. The local legal employer can run the paperwork, but the business case belongs to you. Prepare these inputs from your side before the filing:

  1. A precise job description with required qualifications and years of experience that match the real role.
  2. Evidence of why the role cannot be filled locally within the hiring window, such as search results and interview notes.
  3. A named local counterpart or team for the understudy plan, if required.
  4. Consistent title, salary and reporting line across the contract, the labor market notice and the visa petition.

Inconsistency between the notice, the contract and the petition is an avoidable risk, because denial grounds include misrepresentation of facts. A job title that says "Technical Lead" in one document and "Operations Manager" in another invites questions.

5. Documents and the Notarized Employment Contract

DOLE's December 2021 FAQ lists the documents for a standard AEP. Because the order has since been replaced, read the list as the historical baseline and expect changes, especially after the reported 2026 simplification. The core items were:

  • The application form.
  • The passport bio page and a valid visa (or the visa to follow within a set period).
  • The Philippine tax identification number (TIN) of the employee, or the tax form used to obtain it.
  • The original, duly notarized employment contract or appointment.
  • A certified true copy of the employer's business or mayor's permit, or equivalent registration, for example securities regulator registration for corporations.
  • Proof of the labor market test and a notarized affidavit.
  • For some sectors, other agency permits.

The FAQ states that incomplete applications are not accepted. It also directs that the application be filed with the DOLE office covering the workplace, within 10 working days of signing the contract or before employment starts. That filing place has now changed to the central BLE under the 2026 orders (reported), so do not copy the old routing.

Notarization and consistency. The notarized employment contract is the center of the file. Have it drafted by Philippine counsel or your local legal employer, in English, with the job title, work location, salary and term stated clearly. Every later document should repeat those details exactly. The consulate in Guangzhou also asks for a letter of endorsement from the Philippine employer that is notarized by a Philippine notary public. Treat the contract, the endorsement and the AEP as one coordinated set.

Salary and benefits. The contract should state the real compensation, since the consulate looks for salary as a mark of a real employment relationship. We do not give salary thresholds here because none were confirmed on an official page. If your offer includes housing, relocation or home-country components, discuss with counsel how they are reflected in the contract and in tax and social contributions.

A practical checklist for the AEP stage:

StepOwnerCheck before filing
Role definition and qualificationsYour hiring managerTitle, duties, required experience, work location
Labor market noticeLocal legal employer, with your inputPosting method and duration confirmed with the BLE
Notarized employment contractLocal legal employer and counselStarts only after AEP issuance; details match the notice
Employer corporate documentsLocal legal employerCertified copies current and in the correct name
Employee documentsEmployee APassport validity, TIN, degrees and experience letters
Understudy or training planYour hiring managerNamed counterpart, topics, timeline, if required
Filing and trackingLocal legal employerPortal or BLE channel confirmed; every submission recorded

6. Exclusions and Exemptions: Intra-Corporate Transferees and Others

Not every foreign worker goes through the full AEP. DOLE's 2021 FAQ distinguishes two groups, and the distinction matters for a Chinese group company with existing staff.

Exemptions (documentary proof required) include, among others, diplomatic and international organization staff, visiting and exchange professors under formal agreements, permanent residents and temporary or probationary resident visa holders, recognized refugees, and persons exempted by law.

Exclusions need a Certificate of Exclusion from DOLE. They include voting board members who do not take part in management, a President and Treasurer who are part-owners of the company, and two categories relevant to groups with foreign parents:

  • Intra-corporate transferees. An executive, manager or specialist who was employed by the foreign group for at least one year before being assigned to the Philippines.
  • Contractual service suppliers. A manager, executive or specialist employed for at least one year by a foreign service provider that has no commercial presence in the Philippines.

A trade-press summary of the 2026 order (secondary, single source) lists similar categories and adds that exempt workers still need DOLE approval: the exemption "does not eliminate the filing." It reports a Certificate of Exemption as replacing the AEP in the immigration process. Fee amounts from that article are not confirmed on an official page.

What this means for assigned employees. If your company already employs Employee A in China and assigns Employee A to a Philippine affiliate or branch after more than a year of service, the intra-corporate transferee path may apply. The DOLE FAQ expects supporting documents such as a notarized contract or certificate of employment with proof of salary, and notarized assignment documents. Check three things with counsel:

  1. The one-year employment period is counted from the employment relationship with the sending group company, and records must prove it.
  2. The role must be executive, managerial or specialist in nature.
  3. The Philippine entity must be one that can legitimately receive the assignment.

Why this path usually does not fit a standard EOR hire. The transferee category is built around an existing employment relationship with the foreign group. If the person is hired new through a Philippine local legal employer, the case is more likely assessed as an ordinary AEP, because the employer on paper is the local entity. Which path applies to a mixed structure should be decided with counsel before you commit to a timeline.

Short visits are different again. Business visits and short-term project work raise a separate question of whether any work permit is needed. Section 8 covers the Special Work Permit and the Provisional Work Permit.

7. The 9(g) Pre-Arranged Employee Visa Through the Guangzhou Consulate General

Once the AEP is issued, the employee needs a 9(g) pre-arranged employee visa. The Guangzhou page is useful for Chinese applicants because it names the China-specific authentication steps. It also references pandemic-era resolutions, so confirm the current requirements with the consulate before you build a calendar.

Process in outline. The Philippine employer petitions BI. The consulate then issues the visa after authority from BI and DFA Manila is secured. The applicant attends an interview and submits the documents in person. The page describes eligibility as a real employer-employee relationship, with salary, a selection process and the employer's power of dismissal. That description is why the structure of your local legal employer must hold up in substance, not only on paper.

Applicant documents listed on the Guangzhou page:

DocumentKey details from the page
PassportOriginal and copy, valid at least six months beyond the authorized stay
Visa application form (FA Form No. 2)Completed, with a white-background photograph taken within the last six months
Letter of endorsementFrom the Philippine employer, notarized by a Philippine notary public
Medical certification (DFA Form No. 11)Signed by a physician with notarized signature, chest X-ray and lab reports, and authenticated by the Foreign Affairs Office and the consulate
Police clearance certificateIssued by the competent Chinese authority, notarized, filed within six months of issue, and authenticated by the Foreign Affairs Office and the consulate
Flight itinerary or bookingCopy
Visa processing feeAmount not stated on the page; "additional charges will apply"

The police clearance chain. For Chinese applicants this is the slowest part to organize. The page describes three steps: obtain the certificate from the Chinese authority and have it notarized; submit it to the relevant Foreign Affairs Office (FAO) for authentication; then submit it to the Philippine Consulate General for further authentication. The visa application must be filed within six months of the certificate's issue date.

Timing trap. The medical certificate and the police certificate both have six-month windows. If the AEP takes longer than expected, these documents can expire before the visa file is ready. Consider timing these documents so they are not issued long before the AEP decision, to avoid re-doing authentication. Confirm with the consulate whether the page's windows are still current.

Dependents. A spouse or an unmarried child under 21 needs legal proof of relationship, such as Philippine Statistics Authority marriage or birth certificates, or a Report of Marriage or Birth when the PSA copy is not yet available. The page says dependents must join the principal within six months of the principal's admission. Dependent status is a family matter and outside the scope of this work-authorization guide, so ask the consulate directly.

After arrival. The Guangzhou page says newly issued 9(g) visas carry the notation "FOR ENTRY PURPOSES ONLY, SUBJECT TO BI IMPLEMENTATION," and that the holder must report to BI after arrival for registration, visa re-stamping and an ACR I-Card (the BI's alien registration card). The page cites a reporting window of seven days after the end of quarantine or isolation. That wording dates from the pandemic period, so ask for the current post-arrival deadline. The page warns that failure to report can leave the foreigner improperly documented.

Who files what. The Philippine employer files the petition with BI. The employee handles the in-person consular steps in China. Your project plan needs one owner for the handoff between the two, because the documents must tell the same story: contract, AEP, endorsement and petition.

8. AEP vs Special Work Permit vs Provisional Work Permit

Employers often confuse three permits that serve different purposes. DOLE Cordillera's explainer and the 2021 FAQ give the baseline.

FeatureAlien Employment Permit (AEP)Special Work Permit (SWP)Provisional Work Permit (PWP)
Issued byDOLE (now centralized at the BLE, as reported for 2026)Bureau of ImmigrationBureau of Immigration
PurposeLong-term work for a Philippine employer; prerequisite for the 9(g) visaShort-term work, up to six months, covering short contracts, company projects, performers and special casesAllows a foreigner on a temporary visitor visa to start work while a 9(g) or similar visa application is pending
Typical durationTied to the contract, subject to the validity set by the current orderCovers the short assignmentNormally three months per DOLE Cordillera (undated page); confirm with BI
SponsorPhilippine employer with an employment relationshipPhilippine-registered petitionerLinked to the pending visa application
Link to 9(g)Required before the 9(g) visa is issuedNot tied to a 9(g) in the sources reviewedBridge while the 9(g) is pending

Do not stretch the short permit. The SWP is meant for short, specific engagements. Using it to cover an ongoing role is risky, and DOLE's 2021 FAQ points to the AEP for work beyond six months. If the role will last beyond six months, plan for the AEP and the 9(g) visa from the start.

The PWP can help, but it is not a shortcut. The DOLE Cordillera page describes the PWP as a BI permit for foreigners on temporary visitor visas who want to start work while a 9(g) or 9(d) application is pending. Its availability and conditions can change, and it does not replace the AEP. The 2021 FAQ notes that a PWP may be obtained from BI while the AEP or 9(g) is pending, and DOLE Cordillera's page says BI will not issue the 9(g) until the AEP is obtained. Ask counsel before relying on a PWP to start a hire early, and whether the January 2026 contract-timing point affects that plan.

Business visitors. A Chinese manager who visits the Philippines for meetings is a different case from one who delivers work for a Philippine employer. The line between a business visit and work is a legal question. Do not guess. Short engagements should be reviewed by Philippine immigration counsel before travel.

9. Can an EOR Be the Philippine Employer? Conditions to Check

An EOR, or Employer of Record, is the local legal employer: a locally registered entity that employs the worker on the client's behalf. For the AEP and the 9(g) visa, that local entity is the employer that DOLE and BI will see. So the question is not whether an EOR is "allowed" in the abstract. It is whether the specific entity and arrangement satisfy the conditions in the permit rules. You can read more on the basics in our guide on what an Employer of Record is.

Based on the official pages reviewed, these are the conditions to confirm before you commit:

  1. The employer must be a Philippine-registered entity with valid permits. The 2021 FAQ asks for certified copies of the employer's business or mayor's permit, or registration with the relevant regulator. A local legal employer needs these in place and current.
  2. A real employment relationship must exist. The Guangzhou page defines the relationship by salary, a selection process and the employer's power of dismissal. DOLE Cordillera describes the AEP as requiring a Philippine employer with an employer-employee relationship. The contract, payroll and management practice should match that description.
  3. The role must pass the labor market, economic need and understudy checks. These are about the role and the business case, not about who the employer is. The business case still needs your input, as described in Section 4.
  4. The structure should be reviewed by local counsel. The EOR structure should be reviewed by local counsel against the applicable Philippine rules, and the review should be recorded before you file.
  5. The work location and position must match the permit. Because the AEP is tied to a position and place, daily management by your team in China must not turn into an unreported change of duties or site.
  6. Cancellation and replacement must be planned. The 2021 FAQ describes a clearance process for cancellation and says only one AEP may be held at a time. If the person later moves from the local legal employer to your own Philippine entity, a new AEP is likely needed, and the timing should be planned.
  7. Tax and social contributions follow the Philippine employment. We do not give tax advice here. Ask local counsel and payroll advisers about how Philippine payroll and contributions apply to a Chinese national on assignment or local hire.

For companies deciding between using a local legal employer and registering their own entity, our analysis of EOR versus entity setup costs helps frame the trade-off. If you are comparing providers in the region, see our review of EOR providers in Asia-Pacific, and for a China-outbound angle read our practical guide for China outbound companies.

When an EOR is the wrong fit. If you expect a large, permanent team in the Philippines, or if the role is one of the categories that may be excluded or exempt based on group employment, an own-entity structure or a group assignment path may serve you better. A good provider will tell you that early.

10. How Knit People Supports EOR and Work Visa Hires in the Philippines

Knit People offers Employer of Record services and a dedicated Philippines Employer of Record page. For the visa step, the approved description of the service is this: Knit People supports employers with employee work visa applications, including document preparation, form completion, and communication and follow-up with local authorities, to help employees obtain compliant work authorization under local rules.

The aim of pairing the EOR with visa support is that the employment contract, payroll set-up and permit file are prepared together, so the details match across both agencies. A standalone work visa service is also available as a value-add. Please confirm the scope for your destination with the Knit team before you plan around it.

Knit maintains a China operations hub in Shenzhen. Approval is always decided by the Philippine authorities, and Knit does not guarantee any outcome.

How Knit People Compares

Three questions matter more than brand names. Who is the named employer or sponsor on the application? What does the provider do during the application? Who tracks renewals and changes afterward? Ask each provider to answer in writing for the Philippines.

ProviderHow it describes its visa support (public pages, November 2026)What to confirm
Knit PeopleSupports employers with employee work visa applications, including document preparation, form completion, and communication and follow-up with local authorities, to help employees obtain compliant work authorization under local rulesScope for the Philippines, named employer on the AEP and 9(g) petition, renewal tracking
DeelA managed immigration service handled by in-house specialists and attorneys, plus a self-serve platform that tracks cases; its guide also describes a route where its local entity acts as the employer and sponsors the visaWhether the Philippines is covered, who sponsors, how renewals and government notices are handled

Approval is decided by the local authority whichever provider you choose.

11. Illustrative Scenario: A Chinese Engineer Hired Through the Local Legal Employer

Illustrative scenario (hypothetical, not a real client). A mid-size Chinese electronics company, which we will call Company X, plans a small engineering support team in the Philippines. It wants to place Employee A, a Chinese national and senior test engineer, in the country for about two years. Company X has no Philippine entity and prefers to start through a local legal employer.

The timeline below is a planning sketch, not a promise of speed. Real dates depend on the authorities, on document readiness and on whatever the current BLE guidance requires.

StageWhat happensPoints to confirm
1. ScopingCompany X defines the role, location and duration, and counsel confirms that an AEP rather than a short permit is needed (more than six months)Whether any exclusion applies; counsel review of the EOR structure
2. Business caseCompany X prepares the job description, local search evidence and a named local counterpart for the understudy planWhat the Economic Needs Test and understudy requirement ask for under the current order
3. ContractThe local legal employer and Employee A sign a notarized contract with a start conditional on AEP issuanceDetails identical across all later documents
4. Labor market noticeThe notice is posted by the method the BLE confirmsWhether newspaper publication is still required in your filing window
5. AEP filingThe local legal employer files with the BLE and responds to questionsProcessing ceiling; fee timing; tracking of every submission
6. 9(g) petitionAfter the AEP, the local legal employer petitions BIWhether BI requires any additional papers at that time
7. China documentsEmployee A collects the police clearance, medical certificate and passport documents, with notarization and authenticationSix-month windows; sequencing against the AEP decision
8. ConsulateEmployee A attends the interview in Guangzhou or the consulate that serves their locationConsulate appointment rules; fee amounts
9. ArrivalEmployee A reports to BI for registration and the alien registration cardCurrent post-arrival deadline
10. OngoingThe local legal employer tracks permit expiry and any change of role or siteRenewal lead time; notice of changes

In this scenario the most likely delays are not dramatic. They are small mismatches: a job title that changed between the notice and the contract, a police certificate that was notarized before the AEP decision and then aged out, or a work location that moved from one city to another after filing. Each is avoidable with one owner for document control.

If Employee A had instead been a Company X employee with more than a year of service who was being assigned to a Philippine affiliate, counsel would first test the intra-corporate transferee route described in Section 6.

12. 2027 Planning Checklist and Risk Register

For 2027, treat the Philippine work-permit environment as active. Several orders changed within about five months in 2026, and officials have said they want closer oversight. A good plan assumes further guidance.

Planning checklist

  1. Decide the path early. Standard AEP, certificate of exclusion or exemption, or a short permit. The path drives everything else.
  2. Ask the BLE for current procedure in writing. Filing channel, portal use, labor market notice method, processing ceiling and fee schedule.
  3. Re-check each 2026 order against its official text. Do not rely on summaries, including this one, for anything that will be filed.
  4. Prepare the business case before the contract is signed. Labor market notice, economic need and understudy plan.
  5. Stage the China documents. Notarization and authentication take time, and the six-month windows can lapse.
  6. Use one fact sheet. Title, duties, location, salary and dates identical in every document.
  7. Set renewal reminders. The 2021 FAQ allowed renewal filing up to 60 days before expiry; confirm the current period. Track the 9(g) side as well.
  8. Plan for changes. A change of job, site or employer may need a new permit or an amendment.

Risk register

RiskWhy it mattersSuggested response
Rules change between filing and decisionSeveral orders changed in 2026; effective dates were reported inconsistentlyConfirm applicable rules in writing; keep dated records
Starting work before the AEP is issuedA regional report says the contract takes effect only after issuance; enforcement is closerMake start dates conditional; no work before authorization
Inconsistent documentsDenial grounds include misrepresentation and falsified documentsSingle fact sheet; counsel review of the full file
Expired China documentsPolice and medical certificates have six-month windowsStage them; confirm windows with the consulate
Misuse of short permitsShort permits are for short, specific engagementsUse the AEP path for longer roles
Structure not reviewedPhilippine rules on the employment structure may apply to an EOR arrangementLocal counsel review recorded before filing
Fee and validity assumptionsThe current order's fee schedule and validity were not confirmed in our reviewObtain figures from the BLE before budgeting

Next steps. Talk to local counsel and to your EOR provider before you commit to a start date. If you would like help coordinating a Philippines plan, contact the Knit team. For other destinations, browse our global hiring guides and the Knit blog. The Knit People home page lists the full range of services.

13. Frequently Asked Questions

Q: Does a Chinese employee need both an AEP and a 9(g) visa to work in the Philippines?

A: For employment longer than six months, generally yes. The AEP from DOLE comes first, and the 9(g) pre-arranged employee visa from BI follows, issued through the consulate for applicants abroad. Exclusions, exemptions and short-term permits change the path for some people, so confirm the category with counsel before you plan.

Q: How long does the AEP take?

A: We cannot give a reliable figure. The 2021 DOLE FAQ cited five working days after the labor market test, but that belongs to an older regime. Advisory summaries of a late October 2026 order report a standard period of 10 working days with a possible 10-day extension. Confirm the current period with the Bureau of Local Employment.

Q: Is the labor market test still published in a newspaper?

A: Under the 2021 rules and as described by a regional DOLE office in January 2026, yes. Advisory firms report that DO 248-C removes the newspaper requirement and moves notices to DOLE's portal or a public repository. Reports differ on the effective date, so ask the BLE what applies to your filing date.

Q: Can the AEP be filed by the employer's own HR staff?

A: Reports of the 2026 order say agent accreditation was discontinued, so in-house filing is possible. This is reported rather than confirmed from the order text. A local legal employer or counsel often handles the filing so that the contract, notices and petition remain consistent.

Q: What is the difference between an AEP and a Special Work Permit?

A: The AEP is a DOLE permit for longer employment and is a prerequisite to the 9(g) visa. The Special Work Permit is a Bureau of Immigration permit for short, specific engagements of up to six months. A role that will last longer should not rely on the short permit.

Q: Do intra-corporate transferees need an AEP?

A: DOLE's 2021 FAQ treats an executive, manager or specialist employed by the foreign group for at least one year before the assignment as an exclusion that requires a Certificate of Exclusion. Proof of the one-year period is required. A new local hire through a local legal employer is less likely to fit this category.

Q: What does the Guangzhou consulate require for the police clearance?

A: Its page says the certificate comes from the competent Chinese authority and is notarized, then authenticated by the relevant Foreign Affairs Office, then by the Philippine Consulate General. The visa application must be filed within six months of the certificate's issue date. Confirm current practice with the consulate before you start.

Q: Can an Employer of Record sponsor an AEP and 9(g) visa for a Chinese employee?

A: The Philippine-registered local legal employer is the employer that files, so the structure can be used if it meets the permit conditions: valid permits, a real employment relationship and the required tests. The EOR structure should be reviewed by local counsel against the applicable Philippine rules. Approval is decided by the authorities.

Q: Can the employee start work while the 9(g) visa is pending?

A: Do not assume so. DOLE materials mention a Provisional Work Permit from BI for certain visitors while a 9(g) is pending, and a regional report says the employment contract takes effect only after AEP issuance. Ask Philippine immigration counsel whether any early start is lawful in your case.

Q: Are there fee and validity figures I can budget with?

A: Not from this article. We did not obtain the text of the current DOLE order, so we did not confirm the fee schedule or AEP validity under it. Ask the BLE for the current schedule, and also ask the consulate for visa and authentication costs, which its page does not state.

14. Glossary of Key Terms

AEP (Alien Employment Permit): The DOLE permit that a foreign national and Philippine employer obtain before the foreign national works for more than six months, based on Article 40 of the Labor Code.

9(g) visa: The pre-arranged employee visa issued by Philippine immigration authorities to a foreign national who will work for a Philippine employer.

DOLE (Department of Labor and Employment): The Philippine labor department that issues the AEP.

BLE (Bureau of Local Employment): The DOLE bureau that, under the 2026 orders as reported, now handles AEP functions centrally.

BI (Bureau of Immigration): The immigration agency that handles the 9(g) petition, the Special Work Permit and the Provisional Work Permit.

DFA (Department of Foreign Affairs): The agency whose authorization the consulate needs before issuing the 9(g) visa.

EOR (Employer of Record): A locally registered entity that serves as the local legal employer of a worker on the client's behalf.

LMT (Labor Market Test): The process of publicizing a vacancy to show whether a qualified Filipino is available before an AEP is considered.

ENT (Economic Needs Test): An assessment, described in a January 2026 regional report, of whether the foreign hire is necessary and beneficial to the economy.

Understudy program: A training arrangement under which the foreign worker trains a Filipino counterpart.

SWP (Special Work Permit): A Bureau of Immigration permit for short-term work, generally up to six months.

PWP (Provisional Work Permit): A Bureau of Immigration permit that lets certain visitors start work while a work visa application is pending.

15. About Knit

Knit People was founded in Canada in 2015 and has about 11 years of experience supporting international employers. It serves 4,000+ clients across 172 countries and regions, processes over USD 600 million in annual payroll, operates 60+ owned entities, and maintains a China operations hub in Shenzhen. Its services include Employer of Record, PEO, Global Payroll and Contractor of Record, along with headhunting and recruitment, background checks, entity registration, global tax, insurance and work visa support. Knit holds MSB license No. M23187879. To discuss your overseas team or a cross-border hiring plan, contact the Knit team or review the Employer of Record services page.

16. Related Reading

This article is general information, not legal, tax or immigration advice. Work permit and visa rules change, and Philippine authorities issued several orders in 2025 and 2026. This guide reflects public official texts and reports reviewed in November 2026, and several recent orders were reviewed only through secondary summaries because the official order texts could not be accessed. Confirm every requirement, fee, validity period and effective date with the relevant authority, Knit's local team and licensed local counsel before you act.

Ready to expand your global team?

Contact Us